I have been reading all the articles that have been flying around on this forum and one thing that I picked up is that 20tcf is actually a massive amount and far in excess of the capabilities of both the infrastructure and the demand. I know this may sound naive, but I was blown away that the Gorgon project and the $50b sales represented only a fraction of the potential output. And that Woodside was actually looking for anywhere b/w 1.5tcf - 5tcf for the 2nd and 3rd trains.
I may have some of the measurements completed screwed up and at the risk of sounding completely uninformed I am going to post this, as i am interested to know if I am reading this correctly or I have missed something major.
Thanks
MOE Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held