Correct. I'm told a BFS can cost $10m. We've got 2 of them. Then there's York, and phase 2 drilling.
Funding for mine construction is still to come, and I can't see anything to indicate that we don't still have offers on the table from our 2 preferred banks, which won't be sealed this side of the BFS.