I did a fair bit of work building Chevron's LNG plant on Barrow Island in WA. CO2 is injected back underground after LNG is extracted from the underwater basin and the raw gas is processed. It's then "safely stored" in sandstone deposits under the ocean apparently.
- Forums
- ASX - By Stock
- HZR
- 'Time is not on our side': Big Oil is bracing for future after petrol
'Time is not on our side': Big Oil is bracing for future after petrol, page-13
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
38.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $65.58M |
Open | High | Low | Value | Volume |
38.0¢ | 38.5¢ | 38.0¢ | $16.46K | 43.15K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 138228 | 38.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
39.0¢ | 13760 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 134965 | 0.305 |
4 | 7842 | 0.300 |
1 | 166 | 0.295 |
3 | 24523 | 0.290 |
2 | 31041 | 0.285 |
Price($) | Vol. | No. |
---|---|---|
0.315 | 1600 | 1 |
0.320 | 78620 | 2 |
0.325 | 20047 | 3 |
0.330 | 7001 | 4 |
0.335 | 300 | 1 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
HZR (ASX) Chart |