FUT 0.00% 1.4¢ future corporation australia limited

ATOCHA RE-ENTRY PROJECT UNDERWAY - OCTOBER 15TH 2009It is...

  1. 13,244 Posts.
    ATOCHA RE-ENTRY PROJECT UNDERWAY - OCTOBER 15TH 2009

    It is planned that a rig will be on location within two weeks at which time a further update will
    be released.

    We all know the plan, think FUT will start to rumble when rig is in place, This part of the release says it all


    The HM Brian No.1 well which was drilled by Shell Oil in 1980.
    Petrophysical analysis has concluded that this well contains over 125 feet of bypassed
    Tuscaloosa pay sand. With the benefit of hindsight and some 30 years of experience in the
    Tuscaloosa Trend, experts have indicated that a discovery of this calibre would be
    completed for production. The first Atocha prospect will be tested by re-entering the HM Brian No.1 well.
 
watchlist Created with Sketch. Add FUT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.