MFE 0.00% 1.0¢ magnetite mines limited

GBG will release their costings soon. I sent the following email...

  1. 28,706 Posts.
    lightbulb Created with Sketch. 237
    GBG will release their costings soon. I sent the following email to GBG on the weekend and received the following reply:

    Email: Could you provide a brief/general apportionment of the $1,975 million CAPEX for the respective capital components, i.e., mining, benefaction, power, water, rail, port, etc?

    Reply: Thank you for your email. I can?t give you a detailed breakdown of the cost at this point. However, we will be releasing a new corporate presentation shortly in conjunction with our proposed equity raising. That should provide the detail you require.

 
watchlist Created with Sketch. Add MFE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.