"Another major milestone has been reached on the Northern Gas Pipeline (NGP) with leading energy infrastructure company Jemena announcing that construction of the 622km pipeline is complete.
Antoon Boey, Executive General Manager of Corporate Development, Jemena confirmed the landmark was reached this week with all 622 km, and approximately 34,000 lengths of pipe, being welded, lowered in and now fully buried in the trench."
https://jemena.com.au/about/newsroom/media-release/2018/northern-gas-pipeline-construction-complete
This is is a great achievemeny by Jemena. It sets the scene for all mainland states to be supplied with natural gas via pipeline.
It opens the way for a nationwide hydrogen refuelling network to be created, if the Hazer Process is adopted.
It will also futureproof Australia's natural gas industry, which is a win all round.
Jemena recently joined Hydrogen Mobility Australia, perhaps a clue to what they want to do next?
- Forums
- ASX - By Stock
- The race towards a green future is heating up
"Another major milestone has been reached on the Northern Gas...
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
42.0¢ |
Change
0.005(1.20%) |
Mkt cap ! $65.58M |
Open | High | Low | Value | Volume |
41.5¢ | 42.5¢ | 40.0¢ | $47.28K | 113.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 97549 | 42.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
42.5¢ | 29395 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 134965 | 0.305 |
4 | 7842 | 0.300 |
1 | 166 | 0.295 |
3 | 24523 | 0.290 |
2 | 31041 | 0.285 |
Price($) | Vol. | No. |
---|---|---|
0.315 | 1600 | 1 |
0.320 | 78620 | 2 |
0.325 | 20047 | 3 |
0.330 | 7001 | 4 |
0.335 | 300 | 1 |
Last trade - 12.39pm 04/12/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |