PIR 0.00% $1.49 papillon resources limited

9 May was last time drill results reported. Up to that date...

  1. 2 Posts.
    9 May was last time drill results reported. Up to that date total DH & DH with RC pre-collars totaled about 4,000m but in early July resource estimate reported over 5,000m of DH & DH with pre-collars was used in the calculation. Why has that 1,000 odd metres not been reported with specific meter intercepts? If assay lab turnaround times are so slow management needs to find a solution - eg. ship samples to labs outside Mali.
 
watchlist Created with Sketch. Add PIR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.