FUT 0.00% 1.4¢ future corporation australia limited

You would expect that with testing and results due shortly and...

  1. 3,891 Posts.
    You would expect that with testing and results due shortly and with the confirmation that gas is likely in place this will go for a run in the next few days. 1c must be on the cards. Lets face it its all around the place, why wouldnt it be there.

    "The pulse neutron cased hole log has confirmed the thickness and permeability of potential natural gas
    bearing zones within the Tusacaloosa formation and established, within these, the priority intervals for
    perforation. In addition, a second Tuscaloosa zone, approximately 1,000 feet shallower than the
    primary Tuscaloosa sand target, was confirmed as having gas production potential."
 
watchlist Created with Sketch. Add FUT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.