They stated they would work on ways to improve their drilling such that they had fewer ambiguous results in the future, but that was in relation to next season's Canning, which is almost upon us anyway. However, for this well, I think it is standard drilling. If sands improve updip as postulated, then we may get our flow, and 5MMcfd would be nice given the condensate ratio.
Who knows, if they mob a coiled tube unit for SB, then they could easily do a sidetrack and re-entry in Yulleroo as well with the same unit if needed or warranted.
ARQ Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held