Sure, the "big" results are yet to be proven … BUT …
We had 59 metres @1.25 g/t Gold and 0.43% copper to 132 metres ...
If we had 100 metres at 2 g/t Gold and 0.9% Copper we would probably be well over 10 cents by now
Open Pit is generally very profitable to around 300 metres ……. We are only half that depth and have 50% of what is considered in the Industry as a "High Grade" result for an Open Pit operation ….. with 1 drill hole !!
Personally happy to "punt" here !!
Don't really understand the naysayers. Its not BHP; its a Spec ... with good looking early results. Take it or leave it!