    TECHNICAL UPDATE

    Mt Forrest Iron Project

    As previously reported, outcropping hematite and goethite
    mineralisation over 37,400m2 in the south of the Mt Forrest area,
    returned significant analyses from systematic rock chip sampling on
    25 metre spaced samples.
    Samples Fe
    Range %
    Outcrop Area
    (m2)
    Mean
    Fe%
    67 >57 23,200 60.1
    19 50 - 57 5,200 53.6
    - - 9,000 -
    86 50 - 63 37,400 58.9
    Detailed mapping at 1:2000 scale has now extended over
    approximately 20% of the prospective range area and has identified
    a total of 110,100m2 outcropping hematite-goethite mineralisation.
    Rock chip sampling at 25 m centres has now extended over this
    area (530 samples) and the results are expected in around four
    weeks.
    9/57 Labouchere Road
    SOUTH PERTH 6151
    Western Australia
    Telephone 08 9474 3266
    Facsimile 08 9474 3299
    ABN 28 106 866 442
    Page 2
    No drilling has been possible but the mineralisation mapped to date is
    consistent with the exploration target for DSO material as announced in
    February:
    Extract from ASX Announcement 8 February 2008 Mt Forrest Iron Exploration
    Target
    Exploration target estimation has been calculated using the area of iron
    stone outcrop within the project areas and by applying a density factor of
    3.5 to estimate tonnes per vertical metre (Table 4). Extrapolated to a
    nominal depth of 75metres, this suggests potential for 650 to 750 million
    tonnes of material. Within the five target areas there may be 90 to 100
    million tonnes of material. Based on the surface rock chip sampling within
    these, a grade in the range of 57% to 63% Fe may be achievable.
    There has not yet been any drilling of these targets and accordingly there
    has been insufficient exploration to define a Mineral Resource. The target
    quantity and quality is conceptual in nature. Being conceptual in nature it is
    not certain that further exploration will result in the determination of a
    Mineral Resource.
    Table 1 Exploration Target Estimations
    Target Outcrop Area (Km2) SG Million tonnes per
    vertical metre
    Fe1 0.1210 3.5 0.42
    Fe2 0.0912 0.32
    Fe3 0.0792 0.28
    Fe4 0.0304 0.11
    Fe5 0.0998 0.35
    0.4216 1.48
    All BIF 2.8264 9.89
    9/57 Labouchere Road
    SOUTH PERTH 6151
    Western Australia
    Telephone 08 9474 3266
    Facsimile 08 9474 3299
    ABN 28 106 866 442
    Page 3
    Further mapping and sampling will be undertaken during September.
    Figure 1 Mapping and Sampling Toucan area
    9/57 Labouchere Road
    SOUTH PERTH 6151
    Western Australia
    Telephone 08 9474 3266
    Facsimile 08 9474 3299
    ABN 28 106 866 442
    Page 4
    kkkkkkiiiiiiiiiiilllllllllollooooommmmeeeeeetttttttttttrrrrrrrrrrreeeeeessssss
    00000000000
    Zones of Detailed Mapping
    11111111111 22222222222
    M29/314
    M29/258
    M29/349
    M29/350
    M29/257
    M29/348
    M29/351
    Figure 2 Area of Mapping to end August
    Panhandle Gold-Copper Project
    The results of drilling at Panhandle indicate a best gold intercept of 4m @ 0.43g/t in
    PHC037 and a best copper intercept of 4m at 987ppm Cu in PHC025. These results
    are being integrated with other data sets.
    9/57 Labouchere Road
    SOUTH PERTH 6151
    Western Australia
    Telephone 08 9474 3266
    Facsimile 08 9474 3299
    ABN 28 106 866 442
    Page 5
    Meekatharra North Gold Project
    Scout RAB and Aircore drilling aggregating 104 holes for 7,731 metres have been
    completed at Meekatharra North. Assay results are not expected inside of four
    weeks.
    Yours sincerely
    Gregory J Bromley
    Managing Director
    The information in this report that relates to Exploration Results and Mineral Resources is based on
    information compiled by Mr Gregory John Bromley who is a member of the Australasian Institute of Mining and
    Metallurgy, with more than 5 years experience in the field of activity being reported on.
    Mr Bromley is a full-time employee of the Company and has sufficient experience which is relevant to the style of
    mineralisation and type of deposit and to the activity which he is undertaking to qualify as a Competent Person as
    defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
    and Ore Reserves”. Mr Bromley consents to the inclusion in the report of the matters based on his information in
    the form and context in which it appears.
 
watchlist Created with Sketch. Add MDX (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
-0.007(15.6%)
Mkt cap ! $96.29M
Open High Low Value Volume
4.3¢ 4.3¢ 3.8¢ $18.44K 459.7K

Buyers (Bids)

No. Vol. Price($)
1 148989 3.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 103346 2
View Market Depth
Last trade - 15.28pm 03/12/2024 (20 minute delay) ?
MDX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.