P.S.
SL1 have just started mining a DSO zinc-lead deposit in Nigeria with only about $4 million in pre-production start up capital.
The deposit has an indicated resource of
122,300t at 19.2% Zn for 23,481t Zn plus 863t (Zn in Pb resource) = 24,344t contained Zn
and
10,400t at 27.2% Pb for 2,828t Pb plus 2,812t (Pb in Zn resource) = 5,640t contained Pb
they intend to make three products by crushing and screening and manual sorting
Sphalerite: 50% Zn (approximately 31% of the ore)
Galena: 60% Pb (approximately 3% of the ore)
and a mixed product 30% Zn & 4% Pb (8% of the ore)
Based on project factors (processing, transport costs etc) they estimated economic cut-off grades of 5.8% for Zn, 7.6% For Pb and 10% for the mixed ore. Esh
- Forums
- ASX - By Stock
- Technical Question?
P.S. SL1 have just started mining a DSO zinc-lead deposit in...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEX (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.91M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 89603 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 8500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15656 | 0.435 |
1 | 25000 | 0.430 |
1 | 12000 | 0.420 |
3 | 48000 | 0.415 |
2 | 100500 | 0.410 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 18788 | 1 |
0.455 | 4859 | 1 |
0.460 | 12349 | 1 |
0.465 | 36629 | 2 |
0.470 | 2000 | 1 |
Last trade - 10.06am 02/12/2024 (20 minute delay) ? |
Featured News
PEX (ASX) Chart |
Day chart unavailable