SGL ricegrowers limited

successful well at camden gas project, page-4

Currently unlisted. Proposed listing date: MONDAY, 8 APRIL 2019 11:00AM ##
  1. 1,704 Posts.
    lightbulb Created with Sketch. 7
    now let me see, they have to frac it,
    then pump water in, then dewater and then measure the gas flow...normally take months to achieve result.
 
watchlist Created with Sketch. Add SGL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.