now let me see, they have to frac it,
then pump water in, then dewater and then measure the gas flow...normally take months to achieve result.
- Forums
- ASX - By Stock
- SGL
- successful well at camden gas project
SGL
ricegrowers limited
successful well at camden gas project, page-4
Currently unlisted. Proposed listing date: MONDAY, 8 APRIL 2019 11:00AM ##
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGL (ASX) to my watchlist
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online