STU 0.00% 94.0¢ stuart petroleum limited

Ian, good summary!Of note, STU says the recoverability factor...

  1. 5,867 Posts.
    Ian, good summary!
    Of note, STU says the recoverability factor for the permits down south looks closer to 50%,whilst up north it is around 40% (Tino is an ex-Santos petroleum engineer so he should have a good idea).
    In addition, the pipeline from Worrior should be happening by the end of the year-indicative cost range$3-5m. This will significantly lift Worrior(&Arwon?) production rates.
    Cheers,TAS
 
watchlist Created with Sketch. Add STU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.