"Platform has settled into steady state operations during the quarter...
The F1 and F3 wells have demonstrated a steady and predictable production flow from the D5 reservoir interval with no formation water produced to date.
The SM 71 F1 and F3 wells are performing to expectations and overall production rates will be largely unaffected by the shut in of the F2 well."