SRK 0.00% 3.1¢ strike resources limited

starting mining by april 2010, page-2

  1. 7,936 Posts.
    lightbulb Created with Sketch. 232

    Berau Coal (Indonesia) ¡V On 11 June 2009, Strike announced
    the completion of a feasibility study on the development of
    an open-cut contract mining operation with production
    scaling up from 1.5 Mtpa to 3 Mtpa.

    The study has confirmed that the Berau Project has the potential to generate an annual operating surplus of approximately US$33m, with:

    „h total capital cost of approximately US$19m and
    average operating costs of approximately US$41 per
    tonne; and

    „h a run of mine coal product of medium calorific value
    of 5,400-5,600 kcal/kg GAR with low sulphur - 0.66%,
    as received (AR); ash - 7.3%, AR and total moisture -
    16.6%, AR.

    Strike has executed Heads of Agreement with two customers
    - CNBM International Corporation (CNBM) of China and
    Formosa Plastics Group (FPG) of Taiwan. These agreements
    provide for the sale of an aggregate 2.4 Mt of coal over a two year period and are each subject to execution of a formal agreement.

    Strike has commenced a ~6,000m drilling campaign on the
    Nyapa East block. 51 holes have so far been drilled for
    ~5,000m.
 
watchlist Created with Sketch. Add SRK (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.000(0.00%)
Mkt cap ! $9.931M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 40000 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 76808 1
View Market Depth
Last trade - 10.09am 18/11/2024 (20 minute delay) ?
SRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.