So we can assume Max sized SPS feeding existing infrastructure to service multiple end users making transition as economical as possible. WP only then need Service short sections of poles and wires at the end user rather than miles and miles of distribution from the power source. This could turn out to be huge for supplying companies especially once the concept is accepted abroad.
It’s thought patterns like this that is keeping me in the CCE arena. There is huge potential in this concept alone!.
I just wish they would hurry up
- Forums
- ASX - By Stock
- Stand Alone Power briefing
So we can assume Max sized SPS feeding existing infrastructure...
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist