OEX 20.0% 0.6¢ oilex ltd

Stage 2 Frac complete - Tick

  1. 112 Posts.
    lightbulb Created with Sketch. 3
    CAMBAY-77H WELL –Fracture Stimulation Operations Update

    Stage 1 has been successfully fracture stimulated and isolated from Stage 2
     Elevated overpressure of the reservoir section is ~ 5,000 psi
     Gas detected at surface shortly after Stage 1 frac
     Stage 2 perforations complete
 
watchlist Created with Sketch. Add OEX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.