EBR 0.00% 92.0¢ ebr systems inc.

spudded and drilling, page-6

  1. 1,350 Posts.
    lightbulb Created with Sketch. 1
    Company Announcement ACN 051 212 429 Suite 3 First Floor, 610 Murray St West Perth Telephone: (08) 9481 3322
    PO Box 913 West Perth Western Australia 6872 Facsimile: (08) 9481 3330 Website: www.eaglebayresources.com.au Date: 23thDecember 2007 To: Companies Announcements Office, ASX Electronic Lodgement: Subject: ASX-2 JASMINE-1 Drilling UpdatePEL-182 JV Cooper Basin S.A. Number of pages: 2
    JASMINE-1: PEL-182 COOPER BASIN S.A.
    Eagle Bay Resources, as operator, advises that the JV's fourth wildcat exploration well Jasmine-1drilling with Century Rig-3, is waiting on Halliburton cement trucks to arrive and cement 9 5/8" surface casing. Local rain has temporarily closed roads ­ but expected
    to be re-opened about midday Monday. The Jasmine prospect is a 29MMBO (P10 - if oil is present) stratigraphic play on the
    underexplored NW edge of the Cooper Basin, targeting the Permian Patchawarra oil sands
    as seen 6 km to the south and downdip in the Darter-1 well, drilled by Santos in 1991. The status of Jasmine-1 at 06:00 hrs (CST) on Sunday 23thDecember 2007 was: Location: PEL-182 Planned Total Depth: 2461 metres (TVD) Current depth: 897 metres (TD) Operation: Waiting on Halliburton Cement trucks Next 24 Hour operations:
    Cement 9 5/8" surface casing, install well head and BOPs The participants in the PEL-182 joint venture are:
    Eagle Bay Resources NL 37.6% (operator) Audax Resources Ltd 49.9% Dome Petroleum Resources Plc 7.5% Australian Oil Company Ltd 5.0%


    BY ORDER OF THE BOARD OF
    EAGLE BAY RESOURCES N.L.

    Regards and a verry merry Christmas and New Year to all holders, The Tinhopper
 
watchlist Created with Sketch. Add EBR (ASX) to my watchlist
(20min delay)
Last
92.0¢
Change
0.000(0.00%)
Mkt cap ! $300.4M
Open High Low Value Volume
94.0¢ 94.0¢ 92.0¢ $44.38K 47.42K

Buyers (Bids)

No. Vol. Price($)
1 10000 92.5¢
 

Sellers (Offers)

Price($) Vol. No.
93.0¢ 4568 2
Last trade - 11.31am 22/11/2024 (20 minute delay) ?
EBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.