We have been told the pipeline has $100m of future work already planned. They will be needing this $6 m plus many more.
Steady trading well above the SPP price is probably a good sign it will be oversubscribed.
The last few SPPs have all been oversubscribed and there was no scaling back.
- Forums
- ASX - By Stock
- SPP was in the mail today
We have been told the pipeline has $100m of future work already...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist