I don't know how much the info below has been made official
as yet, but the talk amongst the employees, over an ale are:-
1. Coal seam gas (CSG) is to be piped about 60 km south to
connect into the main gas line.
2. CSG electricity generation nearby
3. The 30M thick coal seam is only the beginning.
Good pickings ahead.