GRR 2.08% 23.5¢ grange resources limited.

Southdown Project, page-5

  1. 793 Posts.
    lightbulb Created with Sketch. 21
    Interesting article you would think they would have mentioned something or had an announcement about a restart not sure what they mean about a restart Southdown is all about getting finance. Some big numbers here $2.885 Billion although they will be producing a 69.6% Fe concentrate .

    From a 2013 investment presentation:

    Southdown Project Achievements  Completed a definitive feasibility study in April 2012 which improved the projects level of accuracy to +/- 15%  Advanced project in terms of project engineering, land acquisition, permitting, drilling and test work  Initial capital expenditure estimated at A$2.885 billion (including EPCM; owners’ costs and contingency of $0.535 billion) – April 2012  Operating costs estimated at A$58.5 per tonne of premium quality concentrate (69.6% Fe) containing low contaminants (excl. royalties) – April 2012  Received submissions for EPC contract tenders for major construction works
 
watchlist Created with Sketch. Add GRR (ASX) to my watchlist
(20min delay)
Last
23.5¢
Change
-0.005(2.08%)
Mkt cap ! $266.1M
Open High Low Value Volume
24.0¢ 24.5¢ 23.5¢ $96.74K 403.4K

Buyers (Bids)

No. Vol. Price($)
5 311733 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
24.0¢ 11914 3
View Market Depth
Last trade - 16.10pm 22/11/2024 (20 minute delay) ?
GRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.