I hope the GNX board, hydraulic engineers and power/cost economists are camped outside Jay Wetherall's door.
They had better have with them a map showing sites for potential pumped hydro schemes, plans and indicative costings of pumped hydro schemes large enough to carry SA through an interconnector fail and ideas for funding quick and expensive, medium and moderate and long and cheaper construction costs.
If they are not there the battery guys will eat our lunch.
GNX Price at posting:
18.5¢ Sentiment: Hold Disclosure: Held