Forget plans for early commercialisation of the Kiliwani North field via the existing infrastructure.
This from Orca's 2009 Annual Report:
The principal targets for 2010 are to:
- Increase the gas processing and transportation capacity to 105 MMcfd on a temporary basis by working with the infrastructure owners,Songas Limited, to ensure this is achievable;
- Assist Songas in planning a permanent expansion of the infrastructure system to 144 MMcfd so that the infrastructure development can commence in Q2 2011 (with the intention that the extra capacity will be operational by the end of 2012)