Doesn't take long to drill sub 900m well. Drilling as such, should b all over by nxt friday.
After which they'll log the oil/gas shows & mayb run a DST, so thats a 3-4 day gig. All in all 10-12 days max.
All the best. Oil should b there. Hasn't gone anywhere since early Cornea wells.