The US Department of Energy and Energy International, Inc. have entered into a Cooperative Agreement to conduct a cost-shared field test demonstrating the operation of commercial-scale steeply dipping bed underground coal gasification (UCG) modules to provide the synthesis gas for a small-scale commercial ammonia plant. The field test and the commercial ammonia plant will be located near Rawlins, Wyoming. During this demonstration test, two or more modules will be operated simultaneously until one module is completely consumed and an additional module is brought on line. During this period, the average coal gasification rate will be between 500 and 1,200 tons per day. A portion of the raw UCC product gas. The UCG facility will continue to operate subsequent. to the demonstration to provide feedstock for the commercial plant. Energy International is responsible for accomplishing specific objectives in accordance with the Statement of Work by designing, installing, operating and monitoring the performance of the UCG modules as the feedstock source for the small-scale commercial ammonia plant. During this period, the project activities focused on project structuring, financing, and project management activities. Because the negotiations with investors were not completed on the schedule anticipated, adjustment of the schedule and activities was necessary. All major activities requiring the expenditure of funds were halted and work was suspended pending the availability of funds and new schedules. These changes have dictated the level of progress or delays for all of the tasks of the project throughout the period of this report.
ECM Price at posting:
13.5¢ Sentiment: Buy Disclosure: Held