First five holes of drilling program were announced today, which includings some encouraging results such as 10m @ 1,289 ppm U3O8
including 5m @ 2,278ppm U3O8 from 73 to 83 metres depth and 4m @ 1,133 ppm U3O8 from 34 to 38 metres.
Other results were low grade.