Surely he had the fishheads obligation with the Uruguryian drilling, after all he was paid by PRY to drill that possibility successfully or was that project B S all the while and a rouse to get more shares out of the poor funding S Hers ?
Drive the project into the dust, be granted maximum shares at their lowest value and still take the excs salary package even at a reduced package.
WOW what a plan and deal , the facts and more unbelievable than the truth !!
PRL Price at posting:
0.3¢ Sentiment: Hold Disclosure: Held