Looks like we will get an idea now.
Compared to the production schedule from Bris it looks pretty good - sure they missed the production target but the grade appears to be way higher than the maximum estimated production target (5.15g/t) which I assume means lower cost per Oz.
Hope the ore that was processed wasn't cherry picked too much.