Much anticipated drill results received Massive sulphides intersected, highlights: 9.2m @ 2.51% NI 11.28m @ 2.17% NI 3.27m @ 2.06% NI 7.1m @ 2.38% NI
All 9 holes hit nickel mineralization
They are working towards becoming a low cost mining operator. Management are pushing on with this and fast, only took 5 weeks from drill bit hitting the ground to results being released