Kancha Thank you for the link ! I feel that the 17.5 MW would be...

  1. 23,765 Posts.
    lightbulb Created with Sketch. 258
    Kancha Thank you for the link !

    I feel that the 17.5 MW would be needed for the first stage of the project although it does not specifically state that in the article , the second stage is 8.5 times as large so would require a corresponding increase in power usage .
    In the States they work power usage as a rule of thumb being around 1 kW needed constantly per tonne of prawns produced per annum , I would think the higher the intensity of the operation (more tonnes per hectare ) and the higher the temp then airation would have to be higher per tonne

    It seems the only hold up is financing or maybe before that they need offtake agreements ?
 
watchlist Created with Sketch. Add SFG (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $12.09M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
47 121484023 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 2921393 10
View Market Depth
Last trade - 12.22pm 04/12/2024 (20 minute delay) ?
SFG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.