Kancha Thank you for the link !
I feel that the 17.5 MW would be needed for the first stage of the project although it does not specifically state that in the article , the second stage is 8.5 times as large so would require a corresponding increase in power usage .
In the States they work power usage as a rule of thumb being around 1 kW needed constantly per tonne of prawns produced per annum , I would think the higher the intensity of the operation (more tonnes per hectare ) and the higher the temp then airation would have to be higher per tonne
It seems the only hold up is financing or maybe before that they need offtake agreements ?
- Forums
- ASX - By Stock
- sfg
Kancha Thank you for the link ! I feel that the 17.5 MW would be...
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.09M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
47 | 121484023 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 2921393 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
32 | 27078633 | 0.002 |
18 | 66035026 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 16396720 | 14 |
0.004 | 2824792 | 10 |
0.005 | 1795951 | 10 |
0.006 | 1118347 | 5 |
0.007 | 200000 | 1 |
Last trade - 12.22pm 04/12/2024 (20 minute delay) ? |
Featured News
SFG (ASX) Chart |