just a meeting place for lunch ?
from the website:
* Level two flora and fauna surveys initiated in 2013 to underpin environmental submissions for the Project to federal and state authorities (EPA and DoEE) in 2016
* Resource definition drilling and trench test work during 2015-2016 culminating in the JORC compliant resource upgrade to 596Mt in-situ SOP
* AMEC scoping study for the processing plant completed in 2015 and incorporated in the company’s Project scoping study
* Pilot Pond construction activities in 2016 for pond seepage and geotechnical evaluations on lake Disappointment to establish build methodologies for causeways and pond infrastructure
* First round evaporation pond and brine trench layout design by independent engineers Knight Piesold in 2016
* Collation of civil contractor submissions for construction packages of Project infrastructure – Talawana Upgrade, Airstrip and Bulk earthworks for Village and Operations centre in 2016 and Pond construction and Harvesting (Q1 2017)
* Lycopodium Engineering scoping study for the revised processing plant design completed in 2016 leading into whole of Project feasibility studies in 2017
* Preliminary numerical hydrogeological models developed for the total project Q1 2017 by Strategic Water Management
&
In 2017, the company is progressing its environmental submissions as well as its Feasibility Studies to definitive status for development.
* Ongoing environmental studies to support the environmental submission approval processes
(ongoing is surely an apt description ..... they have been at it for 4 years as acknowledged above)
* Updated review of the brine processing infrastructure (ponds through to plant) and Definitive Feasibility Study for the whole of Project by Lycopodium Engineers
No news from a number of these promised milestones & apparently our Definitive Feasibility Study is now a Pre Feasibility Study.
I think I have figured it out ...... the Doc is treating this like another PHD ..... the joy is in the theorising, research & refining of a concept, but the actual producing the final submission is the killer.
- Forums
- ASX - By Stock
- Seriously .... is 159 Stirling Hwy Nedlands
just a meeting place for lunch ? from the website: * Level two...
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add RWD (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.114M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 240000 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 189708 | 0.100 |
1 | 10000 | 0.080 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 24000 | 1 |
0.110 | 8500 | 2 |
0.115 | 10000 | 1 |
0.120 | 32686 | 2 |
0.130 | 96000 | 3 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
RWD (ASX) Chart |
Day chart unavailable