EWC 5.00% 1.9¢ energy world corporation ltd

Sengkang lng

  1. 491 Posts.
    lightbulb Created with Sketch. 3
    As posted on hc earlier this year, there are further and recent (last week) Indonesian press reports (see below), which indicate that some of EWC’s Sengkang lng will find its way to Bali…..

    HEADLINE NEWS - JAKARTA - PT Pertamina (Persero), a new push in support of the conversion program of fuel oil (BBM) to gas. Through its subsidiary PT Pertamina Gas (Pertagas), the company will build mini LNG storage facility in Bali. President Director of PT Pertagas Hendra Jaya said the facility will be the first in Indonesia to meet the fuel needs of power plants owned by PT PLN in Bali. Development investments and its mini LNG storage units regasifikasinya estimated between $ 50-60 million with a capacity of about 0.3 MTPA or docked 50 million cubic feet per day (mmscfd). Supply of gas will be supplied from the Bontang LNG located in Kalimantan and Sengkang LNG interchangeably. The facility is expected to meet the fuel needs of power generation capacity of 200 MW. Pertagas will supply the needs of PLN subsidiary, PT Indonesia Power in Bali, 3.36 MTPA for 16 years for the period 2019 to 2035 will diregasifikasi LNG Storage Regasification Unit Land (LSRU) in Benoa Harbour, Bali. The gas will then be channeled to the plant through a pipeline along the 3 kilometers. Hendra said that, in addition to the demand for electricity, Pertagas also will see the market potential in other industries that still use fuel oil to be transferred to the gas. The hope Green Island Bali can be the use of cleaner fuels and pollution-free. "We will also try to develop marketing to hotels and resorts industry that still uses fuel oil to switch to gas. We will make Bali as Green Island, "said Hendra. Pertagas targeting this project can operate in late 2015 or early 2016 and is currently in the stage of land acquisition. The company will buy a storage vessel that is ready to be used with consideration of the Indonesian flag. As for the port, the company in cooperation with PT Pelabuhan Indonesia III (Persero). The success of the mini LNG storage in Bali will be the brand marks the company's further development, especially in eastern Indonesia both for generation and mining industries. Pertagas also continue to make inroads in fuel to gas conversion in the mining industry. Late last year, the prime pemandaatan Pertagas start LNG project in the coal mines owned by PT Mandiri Indominco. Now there are four LNG tanks sent there by land tangi. Currently, a pilot project in PT Berau Coal mine is running by using the land as well tanks. Transportation of LNG for the mining industry will continue to be targeted by the company. And difficult locations will use small LNG carrier. Investment for the construction of the pipeline is also being conducted by the company. Among them are pipe-Belawan Arun worth UD $ 400 million with an estimated ready for operation next month, Semarang-Gresik pipeline along the 270 km with an investment of $ 400 million which will be ground breaking later this year. Estuary pipeline coral - Tejal Gede also performed with dekitar investment $ 100 million. Henderson stated that the company is ready to run the government regulations in the implementation of open access pipeline system. The company hopes the regulation should apply to all players in the industry without discrimination.

    Reporter: Gok Manna Sinaga
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
-0.001(5.00%)
Mkt cap ! $29.24M
Open High Low Value Volume
2.1¢ 2.2¢ 1.8¢ $39.37K 1.942M

Buyers (Bids)

No. Vol. Price($)
1 997000 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 1849678 1
View Market Depth
Last trade - 13.13pm 02/12/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.