ORP 5.71% 3.7¢ orpheus uranium limited

scoping study, page-13

  1. 854 Posts.
    To elaborate further:

    The cost to build the mine is US$310 million
    10% of that is US$31 million
    US$66.5 million minus US$31 million = US$35.5million.

    So ANTAM payed US$35.5 million for 10% of a ~7 million oz equivalent gold resource which is about US$50 per ounce.
 
watchlist Created with Sketch. Add ORP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.