NMR 6.25% 3.0¢ native mineral resources holdings limited

"Completion of the study is expected to take four months with...

  1. 448 Posts.
    "Completion of the study is expected to take four months with the final results expected for completion in January 2012"

    base on my understand:
    - it mean 'study' on drill result expect in Jan (for north area only)
    - then it will take 4 month to work out JORC fir north area

    - they are drilling south area atm, "study" on drill result release every month or two.
    - final drill/study on south is still unknow(too early to tell)
    - after final drill on south, it will take 4 month to calculate JORC for south.

    - west area ? drill havn't start yet, need to finish south first.


    so there will lots of resource update for whole year
 
watchlist Created with Sketch. Add NMR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.