"Completion of the study is expected to take four months with the final results expected for completion in January 2012"
base on my understand:
- it mean 'study' on drill result expect in Jan (for north area only)
- then it will take 4 month to work out JORC fir north area
- they are drilling south area atm, "study" on drill result release every month or two.
- final drill/study on south is still unknow(too early to tell)
- after final drill on south, it will take 4 month to calculate JORC for south.
- west area ? drill havn't start yet, need to finish south first.
so there will lots of resource update for whole year
- Forums
- ASX - By Stock
- scoping study
"Completion of the study is expected to take four months with...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NMR (ASX) to my watchlist