Scheme booklet has gone out to shareholders in the same form as disclosed to the ASX. Eric needs to be asked why it is not disclosing and waxing lyrical about the near-term drilling of Backreef-1 which is a large prospect. Perhaps there is some professional rivalry as it appears not to be a well that ARQ can waste up to $10M drilling!