Market asleep on this one, shell value with one of the most exciting drilling programs to kick off later this month.
Anything less than 20c at this stage is exceptional value.
+ 6 Copper-Gold VMS targets in the same basin//volcanics as Sandfire's Degrussa copper deposit.
+ Min 6,000 metre drilling campaign starting this month.
+ 56m shares on issue/~$2.7m cash/EV ~5m
+ Top 20 own 73%/MD very well regarded and owns 10%
+ Listed last October at 20c and drifted down on low volumes
+ Any hint of copper-gold sulphides and this will fly.
+ High grade manganese rock chips found in 3 separate areas within project tenements to also be drilled shortly.
Cheers
Maverick
- Forums
- ASX - By Stock
- Sandfire Bagger Potential
Market asleep on this one, shell value with one of the most...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BYH (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.516M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 8787159 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 1068035 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 142618 | 0.004 |
12 | 6987149 | 0.003 |
6 | 7200000 | 0.002 |
4 | 7800028 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2578948 | 5 |
0.006 | 1087615 | 6 |
0.007 | 2050000 | 2 |
0.008 | 3505223 | 4 |
0.009 | 1974064 | 2 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
BYH (ASX) Chart |
Day chart unavailable