What cracks me up about the KLL fan club is they don't tell us how long it took to get to the stage of completing the German technical report which together with permitting was the basis of the float.
Was it 6 months, 12 months, 2 years, 3 years?
Furthermore there was no need for continuous disclosure. We have no idea if in sinking their 4 bores they sank a further 6 that were duds? We have no idea if they had periods when the lake surface was flooded as per times at LD.
Since listing they have graded an existing road, cleared a small area of scrub and basically trucked in 4 dongas. Only now they have started doing the hard yards with the drilling rig.
They put out an announcement saying the scoping study would be out soon with soon being 5-6 months later, a slight exaggeration in my opinion.
The point I'm making is that their rate of progress isn't quite like some would have us believe.
- Forums
- ASX - By Stock
- RWD Peer Analysis
What cracks me up about the KLL fan club is they don't tell us...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add RWD (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.114M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 240000 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 189708 | 0.100 |
1 | 10000 | 0.080 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 24000 | 1 |
0.110 | 8500 | 2 |
0.115 | 10000 | 1 |
0.120 | 32686 | 2 |
0.130 | 96000 | 3 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
RWD (ASX) Chart |
Day chart unavailable