found this info below but didnt prime reports that we have 10 "thousand" psi QUOTED(Further pressure testing resulted in a gradual accumulation of 10,000 psi)
Origin Energy, on behalf of the L11 Joint venture, advised that the exploration well Redback South 1, which was completed in October, began a well testing program on November 17, 2009. The well was perforated in the Wagina Sandstone from 3,882.5mD to 3,888.5mD (6 meters).
The Redback South 1 well will be flare tested over a 3-4 day period and then shut-in for a 7 day pressure build-up. This information is expected to give an indication of the potential size and commercial significance of the discovery. Initial gas rates of up to 38.4 mmscf/day have been recorded on a 1" choke, at a flowing wellhead pressure of 1,750 psi. Further information will be released when the test is completed.
THESE GUYS ARE TALKING 1750 PSI AM I MISSING SOMETHING
FUT Price at posting:
0.7¢ Sentiment: Buy Disclosure: Held