Thanks Beau, that certainly fits my read so it will be interesting to see how this all pans out. Separately, I see that the target depth for bottom casing point at 3400m has remained steady throughout the drill and by latest report at 3365m this had only drifted out to 3404m. So I take it that their depth modelling has been pretty spot on so far, which has to auger well for confidence in their mapping of the target zones now coming up.