TRH 0.00% 83.0¢ transit holdings limited

https://www.blm.gov/ut/enbb/view_project.phpENVIRONMENTAL...

  1. 5,269 Posts.
    lightbulb Created with Sketch. 135

    https://www.blm.gov/ut/enbb/view_project.php


    ENVIRONMENTAL NOTIFICATION BULLETIN BOARD
    Project Name: Rights-of-Way for access roads to 3 Potash Exploration Bore Holes on State Land UPDATED WITH AN ADDITIONAL PROPOSED LOCATION - APPLICATION UTU-88102 FILED 8/4/10
    NEPA Log Number: DOI-BLM-UT-Y010-2010-0172-EA
    Field Office/Code: Moab Field Office
    Contact: Jan Denney
    Phone Number: 435 259-2122
    File/Serial Number: UTU-87966, UTU-87967, UTU-88102
    Document Type: Environmental Assessment
    Primary Program:
    Cultural: Watershed:
    Fire / Fuel: Wild Horses:
    Lands & Realty: Wildlife:
    Minerals: Planning:
    Range: Paleontology:
    Recreation: Woodland / Forestry:
    Vegetation: Other:
    Project Description: ADDITIONAL APPLICATION FILED On Aug. 4, 2010, Don
    Hamilton, on behalf of K2O Utah LLC filed application
    UTU-88102 for a road right-of-way to access potash
    exploration bore hole Hatch Point #4-36-29-21. See
    attached map. On May 7, 2010, Don Hamilton, on
    behalf of K2O Utah LLC (K2O), filed applications
    UTU-87966 and UTU-87967 with the Moab Field Office of
    the Bureau of Land Management (BLM) for road
    rights-of-way to access proposed potash exploration
    bore holes on adjacent School and Institutional Trust
    Land Administration (SITLA) managed lands. The
    access to the exploration sites crossing public lands
    would be on designated San Juan County roads and
    would require road rights-of-way from the BLM. K2O
    proposes to upgrade, utilize and maintain roads on
    the BLM National System of Public Lands. Road
    right-of-way UTU-87966 would consist of a 24-foot
    wide travel surface within a 30-foot wide disturbed
    area. The length of the road on BLM lands would be
    approximately 8,980 feet (1.7 miles). One 100-foot
    long turnout is proposed to allow vehicles to pass at
    interval along the access road. One 18-inch culvert
    is anticipated with adequate drainage structures
    being incorporated into the remainder of the road.
    One cattleguard with gate is anticipated at the
    existing gate location. The entire length of the
    proposed upgrade would be along an existing two-track
    road. Road right-of-way UTU-87967 would consist of a
    24-foot wide travel surface within a 30-foot wide
    disturbed area. The length of the road on BLM lands
    would be approximately 12,520 feet (2.53 miles). No
    turnouts are proposed since adequate site distance
    exists in all directions. Two 18-inch culverts and
    three low-water crossings are anticipated with
    adequate drainage structures being incorporated into
    the remainder of the road. Approximately 80% of the
    proposed upgrade would be along an existing bladed
    native surface road with the remaining 20% along an
    existing two-track road.
    Legal Description:
    Meridian:
    Township:
    Range:
    Section:
    General Location and Other Remarks: Maps attached UTU-87966 T. 29 S., R. 22 E., sec.
    17, SE?SE?; sec. 19, E?SE?, SW?SE?; sec. 20, N?NE?,
    E?NW?, SW?NW?, NW?SW?. UTU-87967 T. 29 S., R. 21
    E., sec. 21, NE?NE?; sec. 22, W?NW?, N?SW?,
    W?SE?; sec. 23, SE?SW?; sec. 26, N?NW?; sec. 27,
    W?NE?, NE?NE?. UTU-88102 T. 29 S., R. 22 E., sec.
    31, N?NW?,SE?NW?,N?SE?
    County(s):
    San Juan
    Other:
    Special Interests:
    ACEC: Special Status Species:
    Crucial Habitat: Visual Resources:
    Cultural: Designated Wilderness / WSA:
    Fire Rehabilitation: Wild & Scenic Rivers:
    Riparian: Areas with Wilderness Characteristics:
    None: Native American Concerns:
    Other: America\\\'s Red Rock Wilderness Proposal BLM Natural Areas
    Status and Date of Action: 05/07/10: applications received
    05/14/10: EA initiated
    07/26/10: Revised applications filed
    07/26/10: Revised maps attached
    08/04/10: application (UTU-88102)
    received
    03/14/11: EA posted
    03/14/11: Start 15-day comment period
    04/13/11: FONSI & Decision Record signed
    Comment Period Provided: Yes
    Files:
    files/UTU-87966_Revised_Route.PDF
    files/UTU-87967_Revised_Route.PDF
    files/K2O_Aug_4_10_application.PDF
    files/EA_FONSI_DR.PDF
 
watchlist Created with Sketch. Add TRH (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.