TNP 0.00% 2.5¢ triple energy limited

02/28/2011 05 12490 DRLD T/ 12490'; LOGGED; RAN 9-5/8" LINER F/...

  1. 2,006 Posts.

    02/28/2011 05 12490 DRLD T/ 12490'; LOGGED; RAN 9-5/8" LINER F/ 10122-12490' & CMT W/ 410 SXS; FISHING; RIG REPAIRS;

    Looks like a stuck drill bit. Shouldn't worry TNP/TNPO er's. Plenty of time.
    But wouldn't like to be holding QPNO.

    Code Description
    01 Permitted
    03 Permit Expired w/date of expiration
    04 Drilling (Sidetrack of Existing Well)
    05 Drilling (New drill/Re-entry/Re-Permit)
    06 WOCR - waiting on completion rig
    07 Operations Suspended
    08 WOSP - waiting on state potential
    09 IN TEST - used only in North Louisiana
    10 Completion
    12 Recompletion
    18 Temporarily Abandoned
    29 Plugged - Dry Hole
    31 Dry Hole with future utility
    32 Dry Hole no future utility
    33 Future utility
    ALG along
    BCPD barrels of condensate per day
    BGL below ground level
    BHA bottom hole assembly
    BHL bottom hole location
    BML below mud line
    BOL bottom of liner
    BOP blow out preventers
    BOPD barrels of oil per day
    BP bridge plug
    BS&W barrels OF sediment AND water
    BWPD barrels of water per day
    C&C circulating AND conditioning mud
    CHOKE choke size_/64" (1=positive, 2 - adjustable)
    CIBP cast iron bridge plug
    CIRC circulating
    CMT cement
    COND conditioning
    COR corner
    CP casing pressure (also see conductor pipe when associated with setting pipe in well)
    CP conductor pipe (also see casing pressure when associated with oil/gas test data)
    CSG casing
    DHT dry hole tree
    DO drilled OUT
    DP drill pipe
    DRLG drilling in progress
    DS directional survey
    EL electric log
    EZSV type of squeeze tool
    FEL from east line
    FISHING the procedure used to remove stuck pipe or debris in hole
    FNL from north line
    FR from
    FSL from south line
    FTP flowing tubing pressure
    FWL from west line
    GOR gas/oil ratio
    GVTY gravity (API @60 degrees)
    K/O kick off
    L/D laying down
    LDW deepening of existing well work permit approved in Lafayette District Office
    LNR liners
    LOC location
    LPA plug and abandon work permit approved in Lafayette District Office
    LST sidetrack of existing work permit approved in Lafayette District Office
    LTA temporary abandon work permit approved in Lafayette District Office
    MCF/D thousand cubic feet per day
    MD measured depth
    N/D nipple down
    N/U nippling up
    NWLY northwesterly
    OBM oil based mud
    OH open hole
    OPS operations
    PBHL proposed bottom hole location
    PBTD plugged back total depth
    PERFS perforated interval
    PKR packer
    PM (Producing method) F=flowing GL=gas lift P=pumping
    POOH pulling out of hole
    R/D rigging down
    R/U rigging up
    RA's right angles
    RIH running IN hole
    RR released rig
    S/T side track
    SITP shut-in tubing pressure
    SL section line OR surface location
    SPUD spud date (the actual date that DRILLING began)
    SQZ squeeze
    SWLY southwesterly
    SXS sacks
    TBG tubing
    TD total depth
    TH thence (always used IN describing the location OF the well)
    TIH tripping in hole
    TOC top of cement
    TOL top of liner
    TVD true vertical depth
    W/R wash and ream
    WH Well History and Work Resume Report
    WOC waiting on cement
    WOO waiting on orders
    WOSP waiting on State Potential
 
watchlist Created with Sketch. Add TNP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.