Looks like a stuck drill bit. Shouldn't worry TNP/TNPO er's. Plenty of time. But wouldn't like to be holding QPNO.
Code Description 01 Permitted 03 Permit Expired w/date of expiration 04 Drilling (Sidetrack of Existing Well) 05 Drilling (New drill/Re-entry/Re-Permit) 06 WOCR - waiting on completion rig 07 Operations Suspended 08 WOSP - waiting on state potential 09 IN TEST - used only in North Louisiana 10 Completion 12 Recompletion 18 Temporarily Abandoned 29 Plugged - Dry Hole 31 Dry Hole with future utility 32 Dry Hole no future utility 33 Future utility ALG along BCPD barrels of condensate per day BGL below ground level BHA bottom hole assembly BHL bottom hole location BML below mud line BOL bottom of liner BOP blow out preventers BOPD barrels of oil per day BP bridge plug BS&W barrels OF sediment AND water BWPD barrels of water per day C&C circulating AND conditioning mud CHOKE choke size_/64" (1=positive, 2 - adjustable) CIBP cast iron bridge plug CIRC circulating CMT cement COND conditioning COR corner CP casing pressure (also see conductor pipe when associated with setting pipe in well) CP conductor pipe (also see casing pressure when associated with oil/gas test data) CSG casing DHT dry hole tree DO drilled OUT DP drill pipe DRLG drilling in progress DS directional survey EL electric log EZSV type of squeeze tool FEL from east line FISHING the procedure used to remove stuck pipe or debris in hole FNL from north line FR from FSL from south line FTP flowing tubing pressure FWL from west line GOR gas/oil ratio GVTY gravity (API @60 degrees) K/O kick off L/D laying down LDW deepening of existing well work permit approved in Lafayette District Office LNR liners LOC location LPA plug and abandon work permit approved in Lafayette District Office LST sidetrack of existing work permit approved in Lafayette District Office LTA temporary abandon work permit approved in Lafayette District Office MCF/D thousand cubic feet per day MD measured depth N/D nipple down N/U nippling up NWLY northwesterly OBM oil based mud OH open hole OPS operations PBHL proposed bottom hole location PBTD plugged back total depth PERFS perforated interval PKR packer PM (Producing method) F=flowing GL=gas lift P=pumping POOH pulling out of hole R/D rigging down R/U rigging up RA's right angles RIH running IN hole RR released rig S/T side track SITP shut-in tubing pressure SL section line OR surface location SPUD spud date (the actual date that DRILLING began) SQZ squeeze SWLY southwesterly SXS sacks TBG tubing TD total depth TH thence (always used IN describing the location OF the well) TIH tripping in hole TOC top of cement TOL top of liner TVD true vertical depth W/R wash and ream WH Well History and Work Resume Report WOC waiting on cement WOO waiting on orders WOSP waiting on State Potential
TNP Price at posting:
13.0¢ Sentiment: Hold Disclosure: Held