I know how to read the news mate
... You still didnt answer my question
That drill need to start rolling seriously.
Also, what i said previously... The % grades are irrelevant.
The depth and intersection is the must.
No point having 3% but 4m depth abd intersect.... That would be a flop and uneconomical... Anything over 20m with over 1% will be good. Less... Not so good!
Wait and see... Until then, the market is always right.