GPP 0.00% 0.1¢ greenpower energy limited

Rig at Site Lithium Drilling Turesi, page-3

  1. 1,258 Posts.
    lightbulb Created with Sketch. 78
    If you are asking how many days it will take the rig to get to the landing at Morabisi from Georgetown, it is only 1 or 2 days as far as I know. They use jetty going upstream very fast.

    They go to Parika by road, get a ferry from Parika to Bartica. Then another jetty from Bartica to Morabisi.

    It is 40km from Georgetown to Parika on sealed road.

    55km from Parika to Bartica on Ferry.

    2685B9C8-AC12-41D7-B099-E96CF62BA2A2.jpeg BAC7F6D3-D029-4E94-A42D-7944136AB7ED.jpeg 46B301C5-6AF1-423B-9808-A70B8205C3D0.jpeg 3DE790D8-BE4B-4962-B27A-AD2909B20005.jpeg

    125km from Bartica to Morabisi Turesi site by river

    57E9EA61-7957-47F4-BA5C-D7BBA9BBA572.jpeg
 
watchlist Created with Sketch. Add GPP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.