MRX 0.00% 0.7¢ matrix metals limited

re: results!-to newry Newry -Here is the full ann.8 PAges. If it...

  1. 23,992 Posts.
    lightbulb Created with Sketch. 1
    re: results!-to newry Newry -Here is the full ann.
    8 PAges. If it doesn't take it all - I'll post you a link.
    Rakia
    1131 Hay Street, West Perth, W.A. 6005 PO Box 1036 West Perth, W.A. 6872
    Tel: (08) 9486 7100 Fax: (08) 9486 7300. Website: www.matrixmetals.com.au Email: [email protected]
    J:\Company Sec\ASX\Company Announcements\MtWatsonDrilling1Aprilr04Final.doc
    1 April 2004
    Manager Company Announcements
    Company Announcements Office
    Australian Stock Exchange Limited
    Level 10, 20 Bond Street
    SYDNEY NSW 2000
    ABN 42 082 593 235
    Electronic delivery
    No of pages: 8
    Dear Sir,
    ANNOUNCEMENT
    Primary Sulphide Copper Intersection
    at Mt Watson and Capital Raising
    Summary
    Matrix Metals Limited is delighted to announce the following:
    • A primary sulphide copper drill hole intersection of high grade
    chalcopyrite and chalcocite has been reported at Mt Watson. The drill
    hole, MWRC 130, reported an intercept of 20m @ 3.03% Cu from
    163m including 8m @ 4.89% Cu from 175m. Intersecting this
    primary mineralisation, particularly at this high grade, greatly
    exceeded expectations.
    The drill hole was terminated in high grade mineralisation due to the
    depth capacity of the drill rig being reached. This resource grade and
    width primary copper mineralisation indicates that a sulphide copper
    resource may be defined at Mt Watson.
    • Further success has been recorded in the ongoing oxide copper
    drilling program at Mt Watson.
    • Matrix has reached in-principle agreement with Hartleys Limited
    (“Hartleys”) to place $15 million to its international and domestic
    institutional clients. The Company will also undertake a Shareholder
    Purchase Plan for up to $5000 per shareholder, to all shareholders
    registered with Matrix’s share registry as at Thursday 8 April 2004.
    • The funds raised will be applied to expanded drilling programs in the
    Mt Watson region, increased exploration at the White Range project
    area and to proceed with a exploration program to assess the primary
    sulphide potential over the Company’s Mt Isa inlier tenement holding.
    2
    Primary Sulphide Intercept
    Drill hole MWRC130, in which the primary sulphide mineralisation has been
    intercepted, is located in the Western Zone of the Mt Watson deposit and was
    collared to intercept mineralisation 50m to 70m down dip of the previously
    reported intersection of 70 metres @ 1.34% copper. The drill hole intersected
    significantly higher grade chalcopyrite and chalcocite mineralisation in the target
    area.
    The drill hole was terminated in the high grade mineralisation at 183m due to
    the depth capacity of the drill rig being reached. Drilling equipment appropriate
    for further testing the mineralisation will be mobilised to site as soon as
    practicable.
    The partially complete intersection is highly significant as it is the first intercept
    reporting primary sulphide copper mineralisation of grades and width which
    indicate that a primary sulphide copper resource may be defined at Mt Watson.
    A diagrammatic representation of the MWRC 130 intercept is presented below.
    3
    Oxide Copper Drilling Results
    Matrix has also received assays for copper intersections of significance from
    the ongoing drilling Mt Watson which include:
    Drillhole No Intersection
    MWRC 111 15m @ 1.48 % Cu from 57m
    and 22m @ 1.01 % Cu from 87m
    MWRC 112 24m @ 0.83 % Cu from 60m
    MWRC 113 21m @ 1.42 % Cu from 0m
    MWRC 118 9m @ 1.09 % Cu from 54m
    MWRC 120 8m @ 1.44 % Cu from 41m
    MWRC 121 23m @ 1.17 % Cu from 130m
    MWRC 124 17m @ 0.77 % Cu from 49m
    MWRC 125 8m @ 0.78 % Cu from 51m
    MWRC 129 10m @ 0.92 % Cu from 71m
    MWRC 130 20m @ 3.03 % Cu from 163m
    MWRC 131 6m @ 1.42 % Cu from 80m
    and 9m @ 1.14 % Cu from 103m
    MWRC 133 23m @ 0.94 % Cu from 110m
    The points of significance in regard to these oxide copper intercepts are:
    • The results have confirmed extensions to resource grade mineralisation in
    the up-faulted block immediately north of the Central Zone mineralisation.
    The up-faulting has moved the mineralised horizon closer to the surface in
    this area and has therefore extended the potential size of the open cut
    resource.
    • The results confirm additional widespread relatively thick, high grade
    mineralisation on the down dip northern extension of the Western Zone,
    including the high grade intercepts reported above, which are also
    supported by significant intersections in other nearby holes.
    • Resource grade mineralisation has been confirmed in the 100m spaced
    scout drilling between the Vegetation Anomaly Area and the Western Zone
    which now further extends the mineralisation and resource potential to the
    west.
    Drilling continues at Mt Watson with the mineralisation remaining open in all
    directions. Based on these results and the increased availability of funds as
    detailed in the next part of this announcement, drilling activities at Mt Watson
    will be increased including mobilisation of additional drilling rigs to allow testing
    of the newly confirmed primary sulphide potential.
    Full details of the copper intercepts are presented in Table 1 with drill-hole
    details and locations presented in Table 2.
    4
    Capital Raising
    Matrix has reached in-principle agreement with Hartleys to place 130,434,783
    ordinary shares at an issue price of 11.5 cents per share to raise $15,000,000
    (the “Issue”) principally to Hartleys international and domestic institutional
    clients.
    The Issue is being undertaken in two tranches, with the first tranche comprising
    55,737,746 shares at 11.5 cents per share placed pursuant to the Company’s
    15% placement authority and the second tranche being 74,697,037 shares at
    11.5 cents per share placed subject to shareholder approval at a general
    meeting of shareholders to be held on or about 5 May 2004.
    In addition, the Company also intends to undertake an offer of shares to
    shareholders by way of a Share Purchase Plan (“SPP”) to raise up to a further
    $5,000,000 at 11.5 cents per share. Under the SPP, each shareholder
    registered with the Company’s share registry as at Thursday 8 April 2004 will be
    invited to subscribe for new shares up to a total value of $5,000 each. If
    subscriptions for the SPP exceed $5,000,000 all applications will be scaled
    back pro-rata by the oversubscription percentage.
    Expanded Exploration Program
    The funds raised from the Issue will be applied to an expanded exploration
    program in the Mt Watson region, at the White Range project area and will
    include an exploration program to assess the primary sulphide potential across
    Matrix’s Mt Isa inlier tenement holding. This expanded program will include
    deep drilling to further assess the primary sulphide zone potential of the Mt
    Watson deposit.
    The expanded exploration program will include continuing exploration at the
    White Range Project area with a view to increasing the oxide copper resource
    inventory, targeting an increase in the production life of the project and
    potentially a production capacity increase from the currently proposed
    15,000tpa to 20,000tpa of copper cathode.
    Specifically the expanded exploration program will target the following:
    • Exploration at Mt Watson to further delineate oxide copper resources
    within the known areas of mineralisation of the deposit as well as
    further testing strike extensions to the east and west of the existing
    resource area. In addition, drilling programs will be extended at depth
    to further test the now identified primary sulphide zone.
    • Programs in the Mt Watson region will also be designed to test the Mt
    Watson “look a like” prospects known as Mt Earl, Tewinga and Mt
    Wonder. Regional exploration will also target the identification of
    additional prospects in the Mt Watson region.
    5
    • At White Range, exploration will continue in a more aggressive form
    both to the north and south of the Greenmount deposit as well as at
    the Desolation, Copper Canyon and Toby Barty prospects. All of
    these prospects produced positive results from a scout drilling
    program completed in 2003.
    • Primary sulphide exploration programs will proceed, (in addition to
    the deep drilling at Mt Watson) and will involve field mapping and
    sampling and a range of geophysical programs to identify primary
    sulphide zone drill targets across Matrix’s tenement position.
    These exploration activities will proceed in parallel with completion of the White
    Range Bankable Feasibility Study (BFS) that has been funded by a debt facility
    secured from SG Australia Limited (“SG”). It is noted that the BFS is proceeding
    as planned with defined targets and objectives being achieved.
    Yours Faithfully
    Andrew Chapman
    Chief Executive Officer
    The information in this report that relates to Mineral Resources and Ore Reserves is based on
    information compiled by Mr Bob Dennis. Mr Bob Dennis is a Member of the Australasian Institute of
    Mining and Metallurgy and a full-time employee of the Company. Mr Dennis has sufficient experience
    which is relevant to the style of mineralisation and the type of deposit under consideration and to the
    activity which he is undertaking to qualify as a Competent Person as defined in the 1999 edition of the
    “Australasian Code for Reporting of Mineral Resources and Ore Reserves. Mr Dennis, consents to the
    inclusion in the report of the matters based on information in the form and context in which it appears.
    1131 Hay Street, West Perth, W.A. 6005 PO Box 1036 West Perth, W.A. 6872
    Tel: (08) 9486 7100 Fax: (08) 9486 7300. Website: www.matrixmetals.com.au Email: [email protected]
    J:\Company Sec\ASX\Company Announcements\MtWatsonDrilling1Aprilr04Final.doc
    Table 1
    Mt Watson Deposit
    February & March 2004 RC Drilling
    Details of Copper Intersections
    (cut-off of 0.5% Cu, including up to 2m internal dilution)
    Hole No Intersection
    MWRC111 3 m @ 1.14 % Cu from 51m
    and 15 m @ 1.48 % Cu from 57m
    and 22 m @ 1.01 % Cu from 87m
    MWRC112 3 m @ 0.56 % Cu from 45m
    and 24 m @ 0.83 % Cu from 60m
    MWRC113 21 m @ 1.42 % Cu from 0m
    and 1 m @ 0.58 % Cu from 29m
    and 5 m @ 0.51 % Cu from 32m
    MWRC114 1 m @ 0.63 % Cu from 54m
    and 2 m @ 0.72 % Cu from 57m
    MWRC115 4 m @ 0.83 % Cu from 19m
    and 2 m @ 0.65 % Cu from 31m
    MWRC116 1 m @ 1.05 % Cu from 25m
    and 1 m @ 0.91 % Cu from 30m
    and 1 m @ 0.58 % Cu from 43m
    and 2 m @ 0.81 % Cu from 51m
    MWRC117 1 m @ 0.58 % Cu from 35m
    MWRC118 2 m @ 0.80 % Cu from 24m
    and 3 m @ 0.66 % Cu from 32m
    and 9 m @ 1.09 % Cu from 54m
    and 6 m @ 0.64 % Cu from 69m
    MWRC119 6 m @ 0.90 % Cu from 40m
    and 3 m @ 2.78 % Cu from 79m
    MWRC120 2 m @ 0.74 % Cu from 31m
    and 1 m @ 0.55 % Cu from 37m
    and 8 m @ 1.44 % Cu from 41m
    and 1 m @ 0.91 % Cu from 51m
    MWRC121 3 m @ 1.00 % Cu from 83m
    and 1 m @ 0.85 % Cu from 94m
    and 1 m @ 1.40 % Cu from 101m
    and 23 m @ 1.17 % Cu from 130m
    MWRC122 4 m @ 0.70 % Cu from 52m
    and 1 m @ 1.14 % Cu from 75m
    and 3 m @ 1.10 % Cu from 79m
    and 3 m @ 1.29 % Cu from 89m
    MWRC123 4 m @ 0.52 % Cu from 76m
    and 1 m @ 0.64 % Cu from 113m
    and 1 m @ 0.54 % Cu from 116m
    and 2 m @ 0.64 % Cu from 121m
    MWRC124 4 m @ 0.68 % Cu from 36m
    7
    and 17 m @ 0.77 % Cu from 49m
    and 1 m @ 0.67 % Cu from 71m
    MWRC125 5 m @ 1.22 % Cu from 31m
    and 4 m @ 1.03 % Cu from 43m
    and 8 m @ 0.78 % Cu from 51m
    MWRC126 4 m @ 0.66 % Cu from 34m
    MWRC127 1 m @ 1.00 % Cu from 68m
    MWRC129 1 m @ 0.55 % Cu from 26m
    and 6 m @ 1.60 % Cu from 38m
    and 1 m @ 0.67 % Cu from 50m
    and 1 m @ 0.60 % Cu from 54m
    and 1 m @ 0.96 % Cu from 58m
    and 10 m @ 0.92 % Cu from 71m
    MWRC130 1 m @ 0.56 % Cu from 69m
    2 m @ 0.86 % Cu from 83m
    and 1 m @ 0.53 % Cu from 89m
    and 20 m @ 3.03 % Cu from 163m*
    including 8 m @ 4.89 % Cu from 175m*
    MWRC131 6 m @ 1.42 % Cu from 80m
    and 9 m @ 1.14 % Cu from 103m
    and 4 m @ 0.97 % Cu from 122m
    and 5 m @ 1.00 % Cu from 133m
    and 1 m @ 0.61 % Cu from 158m
    MWRC132 1 m @ 0.66 % Cu from 113m
    and 1 m @ 1.01 % Cu from 119m
    MWRC133 4 m @ 1.31 % Cu from 76m
    and 3 m @ 1.06 % Cu from 85m
    and 1 m @ 0.93 % Cu from 99m
    and 1 m @ 0.64 % Cu from 104m
    and 23 m @ 0.94 % Cu from 110m
    * Incomplete intercept, last interval above cut-off
    Table 2
    Mt Watson Deposit
    February & March 2004 RC Drilling
    Drill Hole Details and Location
    Hole No Northing Easting RL Dip Azimuth (mag) Hole Depth (m)
    MWRC111 5018.7 9548.6 274.4 -70 198.3 131
    MWRC112 4999.6 9750.6 256.4 -60 198.3 93
    MWRC113 5008.5 9849.2 262.6 -60 198.3 81
    MWRC114 5023.4 9898.7 262.5 -60 198.3 87
    MWRC115 5024.5 9952.3 265.9 -60 198.3 93
    MWRC116 5043.9 9950.1 264.4 -70 198.3 87
    MWRC117 5064.8 9949.4 267.3 -70 198.3 63
    MWRC118 5049.2 9899.2 263.6 -70 198.3 75
    MWRC119 5068.6 9898.8 264.4 -70 198.3 99
    MWRC120 5056.6 9848.9 275.3 -70 198.3 87
    MWRC121 5080.1 9500.0 288.4 -70 198.3 171
    MWRC122 5020.6 9298.7 286.3 -70 198.3 105
    MWRC123 5055.5 9300.1 286.7 -70 198.3 135
    MWRC124 4917.9 8999.9 253.8 -60 198.3 87
    MWRC125 4933.8 9104.0 259.2 -60 198.3 81
    MWRC126 4959.4 9199.8 253.6 -60 203.0 63
    8
    MWRC127 5024.9 9999.9 266.6 -70 198.3 111
    MWRC128 5012.4 10099.4 260.8 -70 198.3 105
    MWRC129 4975.8 10200.1 267.2 -70 198.3 99
    MWRC130 5084.0 9451.7 283.2 -70 198.0 183
    MWRC131 5086.9 9400.5 285.4 -70 198.3 183
    MWRC132 5033.2 9199.8 290.4 -70 198.3 141
    MWRC133 4984.4 9099.0 285.1 -70 198.3 135
    END
 
watchlist Created with Sketch. Add MRX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.