: geo modelling (3 D)
: Metallurgical Study / ? test work
: Complete Optimisation studies
This work to be completed by end of Q 1 - 2015 on a $10,000 budget of cash in the bank - mmmmmm
The third on the list has been going since Ann 31 Jan 2013 and Ann Dec 2013 and still IGS presents nothing concrete as to scheduling or time frame to complete this task - not even a Pre-F takes this long.
I have seen no results or reports of any significant work undertaken to put the Brazil project into production when other ASX companies in Brazil have done so on significantly lower JORC (inferred/indicated) resources.
NOT GOOD ENOUGH verging on incompetence !!!
IGS Price at posting: