OKU 5.26% 15.0¢ oklo resources limited

By the 19th May, the 3 hole diamond drilling program had...

  1. 2,233 Posts.
    lightbulb Created with Sketch. 35
    By  the  19th  May,  the 3  hole  diamond  drilling  program had commenced and is
    expected to take about  10 days to complete,  then  4  or  5  days  to  log  the  cores
    prior  to  despatch  to  the  lab  for  testing. So  15  days?  after  drilling  commenced
    by  the  19th  May,  guessing  the  samples  have  been  logged  and  as  of  today,
    1st  June  are  possibly  heading  for  the  lab. 19/5/16  P2

    Assuming  no  delays  and  all  my  other  guesstimates  are  correct,   results  of
    drilling in  the  red  hot  high  grade  zone  at Diabarou  could  be  due
    from  Thurs  9th June
      onwards.

    Apart  from  giving  our  SP  a  great  chance  of  a  lift  with  high  grade  gold  results
    expected  (by  me),  the  DD  results  will  provide valuable structural information to
    assist in the design of the RC program (18 holes for 2,400 metres).
    The  DD  results  will  guide  the  RC drilling campaign to test the open pit resource
    potential of this prospect.


    While  the DD cores  are  being  logged  about  now,  the  rig  is  headed  for  a  quick
    trip  to Selingouma  to commence a planned 8,000 metre aircore (AC)
    drilling program
    before returning to Diabarou to undertake the RC drilling program,
    which  consists of (18 holes for 2,400 metres). Selingouma  is  in  the  bottom  section
    of  the  Dandako
    project  lease  and  Diaborou  is  at  the  North  end.

    All  fully  funded,  heaps  of  drilling,  heaps  of  testing  results  and  looking  really
    good  for  the  SP  in  the  next  few  months.

    Just  the  opinions  of  a  Doodledog DYOR
 
watchlist Created with Sketch. Add OKU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.