-y-
Your idea is basically one of the underlying principles of the Snowy Mts. Hydro Scheme.
The difference is that base load coal powergen elsewhere provides the off peak power to pump water back up to higher dams.
The Scheme generally provides powergen for morning and evening peaks loads.
In Sydney, I supoose a new long, low dam could be constructed below Warragamba Dam to collect water after hydro powergen, to be pumped back up using off peak day time solar/wind from elsewhere in the state.
Cheers
Dex
- Forums
- Science & Medicine
- Renewable Energy Idea
-y- Your idea is basically one of the underlying principles of...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online