Philley, not quite. According to the DMP it must be drilled by 31/1/13.
Having said that, if they can't secure a rig in time they could apply to the DMP for a variation of the work commitments. It would not be the first time if that a work commitment was varied.
- Forums
- ASX - By Stock
- regional play potential
Philley, not quite. According to the DMP it must be drilled by...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online