KEY 0.00% 0.1¢ key petroleum limited

Cyrene 1 must be drilled before the end of the calender year as...

  1. 782 Posts.
    lightbulb Created with Sketch. 66
    Cyrene 1 must be drilled before the end of the calender year as part of the joint venture obligations in the permit area so there is an urgency attached to the negotiations.
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.